Laserfiche WebLink
A Workshop sessi0~ to discuss proposed Sewer & Water contract for the <br />Myers Corners Development Corp. (WaldbaUm, s plaza) was held on 8-28-79 <br />at 6:30 P.M, in the American Legion Hall. <br /> <br />PreSent:'Mayor Synnett~ Tr. Alfonso, Tro Lawrence~ Tr. Silvestri~ Tr. <br />Viglotti, Tr. DiGregorio and Atty. Lyons. <br /> <br />Also present: Water Commissioners Catalano, Berinato'& Chase. <br />Robert Levine, Aaron Malinsky, Atty. Albert Roberts and Vincent <br /> <br />Atty. Lyons repo~ted previous meeting held and several points should be added <br />to the contract. He stated rider to contract covers everythin9 previously <br />discussed. <br />He stated specifically developer shall install a 10,000 galo holding tank <br />with a ~eter at the outflow to monitor smae. If additional capacity is <br />required, builder would provide same. <br />Instead of a closing loop, contractor would install an 8" water main <br />from existing hydrant'at Rockledge Apts. to Dean Trucking <br />Install master meter to measure flow of water at property line. <br />Connect to sewer and water lines at Country Cleaners as specified by <br />DoC. Health Dept. <br />Village will not guarantee water pressure. <br />They will pay minimum water rates or double rates as users in the Village <br />which may be raised from time to time. <br />They will pay the same sewer rates as outlined in the contract between the <br />Village and To~n of Poughkeepsie and further contract negotiations concerning <br />rates may be increased by 10~ but not less than 6~. <br />Duration of the contract would be 15 yrs. fro~ the date of 1st connection and <br />Village could cancel contract after 13 yrs. There would be an option to <br /> <br />Corporation can cancel contract on six months notice whenTri-Municipal <br />becomes a realty or the the Town installs water. <br />It was agreed that rental space would not be provided for cars washes or <br />laundromats. Contractor cannot connect to system until all work is done. <br /> <br />Mayor Slmnett reported contract should include 2 pu~ps rather than one <br />and this was agreed upon. <br /> <br />Motion by Tr. Silvestri~ seconded by Tr. DtGregorio that the Village <br />accept the amended contract with Myers Corners Development Corp~ for <br />sewer and water. <br /> <br />It was also agreed upon that the contractor be committed to put $48tO00. <br />into the water system. <br /> <br />Roll call vote: All voting in favor. <br /> <br />Motion by Tr. Alfonso, seconded by Tr. Viqlotti that the Mayor be authorized <br />to execute the above mentioned contract. Carried. <br /> <br /> <br />