Laserfiche WebLink
S~ecial meetin9 of the Village Board of Trustees was held on 6-17-82 in <br />Mesier Homestead at 7:00 P.M. <br /> <br />Present: ~ayor Synnett~ Tr. C~ta, Tr. Greco, Tr. Mazochi, Tro Brownm <br />Atty. Lyons~ Eng. LaPar~ Eng. Martin & ~ng. Paggi. <br /> <br />Request from Mr. Bob Duncan~ ~id-Hudson Valley Vietnan Veterans of A~erlca~ <br />to hold a parade on 6-9-82 in conjunction with 14IA/~(I~ Day starting at ?:00 PM. <br /> <br />Motion by Tr. Costa, seconded by Tr. Greco that permission be granted above <br />request and Police Dept. be so notified. Carried. <br /> <br />Eng0 LaPar outlined the new proposals for Tri-~unicipal. <br /> <br />Total estimated cost for Village: $8,459~255; $1,456~542 cost to Village <br />with State_ and Federal aid. Deducted (about $212.80 per unit annual cost) <br /> <br />There ~ollo~e~ a discussion on an alternated proposal. Could Village site <br />handle new reduced load? What treatment levels would be required? State and <br />EPA now wants Tri~Municlpal to study these possibilities. <br />ElS'study would be required and historical and archological studies. <br />We were at first told the Village site was unacceptable and are now asked <br />to restudy it. <br /> <br />It was agreed the next ~eeting of the Tri~4unicipal Comission, the Village <br />representatives would ask for a re-evaluation of the present Villaoe plant <br />as the location for the facili~y. <br /> <br />closed <br /> <br />J~mes J, Lyons <br />Acting Clerk <br /> <br /> <br />