Laserfiche WebLink
• Village/ Bain Park Survey and Masterplan (KC 12-0072) <br /> • KC scope includes: <br /> • Survey Fieldwork and Mapping for Bain Park and DPW Yard; <br /> • Conceptual Master Plan for Bain Park; <br /> • Site Design for Playground Equipment Area; and <br /> • Long Form Part 1 EAF. <br /> • Survey Fieldwork and Mapping was completed in 2020 and the design phase began. <br /> • KC presented the Conceptual Master Plan to the Village Bain Park Project Committee <br /> on February 24, 2021. <br /> • The Plans were well received. <br /> • The Village Committee requested that the project be placed on hold,pending 2021 <br /> Village Budget review. <br /> • At the Feb 24, 2021 meeting, Village Reps mentioned that there is a grant in place <br /> for the Play Equipment, and the Village is waiting for CDBG Grant decision <br /> expected in May 2021 for additional Bain Park Improvements. <br /> • The Play Equipment Vendor expects to install the Equipment in around July 2021. In <br /> advance of that, there is site work for the Village to complete. <br /> • Design coordination, Bidding, and Construction must proceed before the Village <br /> can schedule Play Equipment installation. <br /> • Design remains on hold per the Village. <br /> • Bidding and Construction has not been authorized. <br /> • Village Board is to determine schedule forward and next steps. <br /> • Does the Village plan to schedule a Public Meeting and resume prior authorized <br /> design work? <br /> • Village/ EPA Grant Brownfield Assessments (KC 4077-002) <br /> • Next Steps are expected to be Phase 2 Assessments at the Bleachery pending EPA <br /> approval to proceed, and other sites to be identified. <br /> The above summarized villaze non water department proiects to date. <br /> 201h Anniversary of 911 Memorial Service. <br /> Motion by Trustee Niznik to have the service in Mesier Park on 9/11/2021. Seconded by Trustee <br /> Ponte. Carried. <br /> Approval 51h Annual"Festival at the Falls". <br /> Motion by Trustee Huber to approve the 5h Annual " Festival at the Falls"to be held 9/18/2021 <br /> frome 12 Noon to 6 PM. Seconded by Trustee Ponte. Carried. <br /> Storage of material presently stored at the industrial park. <br /> Page 2 of 5 <br />