My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-29 Minutes
VillageOfWappingersFalls
>
Village of Wappingers Falls
>
Village Board Minutes
>
2020-29
>
2021
>
2021-09-29 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2021 12:27:18 PM
Creation date
10/6/2021 12:27:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2021-09-29 Village Board Workshop Meeting <br /> Non-Water Related Prosect <br /> • Village / Boat House Exterior Improvements (KC 4600-057) <br /> • Exterior improvements - Parking Lot, Concrete Patio, Site Lighting. <br /> • Contractor Woodland Manor. <br /> • Construction was nearly complete in 2020. <br /> • Remaining construction work includes installation of parking lot light poles. <br /> • On Fri Sept 24, 2021 , Contractor installed concrete foundations for light <br /> poles. <br /> • Contractor is scheduled to be onsite Wed Sept 29, 2021 to complete the <br /> remaining work. <br /> • KC efforts are nearly complete pending project closeout. <br /> • Village / Grease Trap Engineering Planning Grant (KC 12-0058) <br /> • On July 2, 2021 , KC provided Engineering Report including Proposed <br /> Grease Interceptor Code on for review. <br /> • Comments were received from Lisa Cobb on behalf of the Village. <br /> • NYSEFC comments were received in Aug 2021 . <br /> • Revisions and responses are underway. <br /> • Village / Bain Park Survey and Masterplan (KC 12-0072) <br /> • March 2020 KC authorized scope included: <br /> • Survey Fieldwork and Mapping for Bain Park and DPW Yard; <br /> • Conceptual Master Plan for Bain Park; <br /> • Site Design for Playground Equipment Area; and <br /> • Long Form Part 1 EAF. <br /> • The above work was partially completed. The Village placed the project <br /> on hold pending funding. <br /> • In Sept 2021 , the Village took the project off from hold by authorizing <br /> additional engineering scope required for the established funding. <br /> • Sept 2021 KC additional authorized scope included: <br /> • Additional Design for public bidding process; SWPPP; and Bidding <br /> Support. <br /> • Following receipt of written authorization from the Village, KC Engineering <br /> efforts were restarted. Work is underway in preparation for April 2022 <br /> construction. <br /> • Village / Local Watershed Revitalization Prosect (LWRP) / Nine Element Plan <br /> (KC 4077-001 ) <br /> • On April 26, 2017, the Village Board authorized this project. <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.