My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-27 Minutes
VillageOfWappingersFalls
>
Village of Wappingers Falls
>
Village Board Minutes
>
2020-29
>
2021
>
2021-10-27 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 10:10:12 AM
Creation date
1/11/2022 10:10:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes following the 10/27/2021 Village Board Meeting <br /> Welcome to the second monthly Village of Wappingers Falls meeting of the Mayor and <br /> Board of Trustees today Wednesday, October 27, 2021, 5:00 PM <br /> PLEDGE OF ALLEGIANCE TO THE FLAG: <br /> ROLL CALL BY THE CLERK OF THE VILLAGE Mayor Cerino, Aye. Trustee Sidote,Absent. Trustee <br /> Ponte, Aye. Trustee Niznik,Absent. Trustee Huber, Aye. Trustee Ruffen, Aye. Trustee Lauricella. <br /> Aye. Village Attorney Wallace, Aye.. <br /> AUTHORIZATION TO PAY BILLS AS PER APPROVED WARRANTS <br /> Motion by Trustee Lauricella to approve paying the bills as audited. Seconded by Trustee Ponte. <br /> Carried. <br /> REGULAR SESSION: <br /> KC Engineering update. <br /> KC Report for <br /> Village of Wappingers Falls <br /> 2021-10-27 Village Board Workshop Meeting <br /> Non-Water Related Proiect <br /> • Village/ Boat House Exterior Improvements (KC 4600-0571 <br /> • Exterior improvements —Parking Lot, Concrete Patio, Site Lighting. <br /> • Prime Contractor is Woodland Manor with a subcontracted Electrician. <br /> • Construction was nearly complete in 2020. <br /> • Contractor has installed the four-parking lot light poles. Each was to include a banner. Only <br /> two include a banner. The Contractor is following up with the Electrician and the Supplier <br /> to resolve. <br /> • KC efforts are nearly complete pending project closeout. <br /> • Village/Grease Trap Engineering Planning Grant (KC 12-0058) <br /> • Revisions and responses are underway. <br /> • Village/ Bain Park Survey and Masterplan (KC 12-0072) <br /> • Work is underway in preparation for April 2022 construction. <br /> • Village/ Local Watershed Revitalization Project(LWRP)/ Nine Element Plan (KC 4077-001) <br /> Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.