My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-23 Minutes
VillageOfWappingersFalls
>
Village of Wappingers Falls
>
Village Board Minutes
>
2020-29
>
2022
>
2022-02-23 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 9:21:24 AM
Creation date
3/23/2022 9:21:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KC Report for <br /> Village of Wappingers Falls <br /> 2021-01-26 Village Board Workshop Meeting <br /> Non-Water Related Prosect <br /> • Village / Boat House Exterior Improvements (KC 4600-057) <br /> • Exterior improvements - Parking Lot, Concrete Patio, Site Lighting. <br /> • Prime Contractor is Woodland Manor with a subcontracted Electrician. <br /> • Construction was nearly complete in 2020. <br /> • The Contractor installed the four (4) parking lot light poles. Each was to <br /> include a banner. Only two (2) include a banner. <br /> • In early 2022, two (2) replacement light poles were delivered to the site and <br /> installed. The poles arrived without the hardware to mount the banner arms. <br /> The Contractor continues to push the Supplier for resolution. <br /> • KC continues to push the Contractor to resolve the light pole banner arm <br /> issue and provide the paperwork required to close out this project with the <br /> Village. <br /> • KC efforts are nearly complete pending project closeout. <br /> • Village / Bain Park Survey and Masterplan (KC 12-0072) <br /> • On Feb 22, 2022, design documents were submitted to Dutchess County <br /> Department of Planning and Development and Village of Wappingers Falls <br /> for review in preparation for Bidding and Construction. Submittal included: <br /> • Long Form EAF. <br /> • DRAFT Target Dates Schedule. <br /> • Engineer Opinion of Cost Estimate. <br /> • Full set of drawings. <br /> • Full set of bid documents. <br /> • Village Board is to provide SEAR determination. <br /> • Village / Route 9 Sewer 2022 (KC 12-0180) <br /> • By Feb 25, 2022, design documents will be submitted to Dutchess County <br /> Department of Behavioral and Community Health (DCDH), NYSDOT and <br /> Village of Wappingers Falls for review in preparation for Bidding and <br /> Construction. <br /> • Village / Local Watershed Revitalization Project(LWRP) / Nine Element Plan (KC 4077- <br /> 0 <br /> • On April 26, 2017, the Village Board authorized this project. <br /> • KC scope resulted in the development of a Wappinger Creek Watershed <br /> Characterization and Recommendations Report, which has been <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.