Laserfiche WebLink
<br />MINUTES OF THE ZONING BOARD OF APPEALS MEETING HELD 3/10/15 <br /> <br />Present: Allen Firstenberg, Chairman, Bridget Gannon, Vice Chair, Rachel DiGrazia, Heidi <br />Murphy, Hilda Duque, Lou Viglotti(Attorney) and Mary Ann Loncto, Secretary <br /> <br />Absent: Frank Barresi <br /> <br />Others Present: Trustee Huber Frank Buyakowski <br /> Bill Povall Robert Lackaye, Attorney <br /> <br />DAVIS FOWLER GROUP FOR DUTCHESS SHOPPING PLAZA <br />First on the agenda was the public hearing on the request of Davis Fowler Group, LLC, 25 <br />Corporate Park Drive, Ste., C, Hopewell Junction, NY seeking the following area variances to be <br />able to enlarge and rebuild sections of the Dutchess Shopping Plaza that were previously <br />(1) Minimum lot <br />damaged by fire located at 1582 Route 9. The area variances needed are: <br />coverage <br /> – allowed is 85%, existing is 98% and proposed is 97% - therefore a 12% variance is <br />(2) Frontsetback (principal) <br />requested, – allowed is 2 ft. min/12 ft. max, existing is 43.8 ft. to <br />90.1 ft., and proposed will range from 55.2 ft. to 90.1 ft. – therefore a 78.1 ft. setback variance is <br />(3) Front Setback (Secondary) <br />requested. – allowed is 2 ft. min/12 ft. max., existing is 68.3 to <br />107.0 ft., and proposed is a maximum of 107.0 ft. – therefore a 95.0 ft. variance is requested for <br />(4) Side Setback <br />the existing setback. – allowed is 0 ft. min/24 ft. max., existing is 47.4 ft. to <br />54.6 ft., proposed is 49.3 ft. to 70.2 ft., - therefore a maximum 46.2 ft. setback variance is <br />(5) Building height <br />requested. – allowed is 72 ft. max. (2 stories min. /6 stories max), existing <br />is 1 story and proposed is 1 story – therefore a one story variance is requested. Mr. Frank <br />Buyakowski owner of the plaza, Mr. Bill Povall, Engineer for the project and Mr. Robert <br />Lackaye, Attorney for applicant were all present. It was stated that proof of publication in the <br />February 26, 2015 edition of the Poughkeepsie Journal was submitted and Certificates of Mailing <br />the legal notice the required 14 days before the meeting (mailed on February 24, 2015) was also <br />submitted. It was further stated that there are no outstanding debts owed to the Village and no <br />known violations. Mr. Povall stated that this project was submitted to the Planning Board for <br />discussion at their March 5, 2015 meeting but in order to continue with the Planning Board, there <br />are four (4) variances that the proposed action will require. The southern end of the plaza is <br />proposed to be replaced due to fire damage. The owner is proposing to replace this 9,066 sq. ft. <br />portion of the building with a 7,381 square foot building that is to be shifted back away from <br />Route 9 to improve parking and parking lot access in that area. As part of the rebuild, the curbs, <br />sidewalks and pavement will be modified as shown on the amended site plan. The north end of <br />the plaza which was occupied by Domino’s Pizza, was destroyed by a fire last year. That portion <br />of the existing building has been removed and a concrete slab foundation remains in that space. <br />This 1,389 sq. ft. section of building is proposed to be reconstructed with a 1,624 sq. ft. attached <br />structure. A slight change to the building configuration is proposed to accommodate the <br />reconstruction and provide more efficient space. Because of the reconstruction – the following <br />variances will be needed: (1) the requirements for a front setback (principal) in the CMU district <br />is 2 ft. min/12 ft. max. The current pre existing non conforming front yard setback to Route 9 <br />ranges from 43.8 ft. to 90.l ft. This setback is to the southern fire damaged portion of the <br />building. With the proposed rebuild of this portion of the building, the new setback will range <br />from 55.2 ft. to 90.1 ft. With a maximum setback proposed to remain at 90.1 ft. a 78.1 ft. <br /> <br />