Laserfiche WebLink
Specialmeeting of the Village Board held Wednesday, June 22,1983 at <br />?IOOpomo at the American Legion Hall. <br /> <br />Present= Mayor Synnett, Trustees Carey, Cioppa~ Greco) and Mazochi; <br />Att~y Lyons and Treasurer Campilii. Trustee Costa was absent due to <br />illness. Trustee Brown did not attend. <br />Also present= David Alfonso~ Kevin Delehanty~ and William Marcojohn <br />of the S.~, Johnson Building Committee, Engineer Paggi. <br /> <br />The purpose of the meeting was to discuss the proposed addition to <br />the $.W.Johnson,Firehouse. <br /> <br />Bngineer Paggi explained that towards the end of May, the Johnson <br />Engine Co. was presented with a sketch and cost estimates for a <br />30'x72' addition to the present firehouse. An allowance was <br />eluded for several items such as heat, ~entilation, and electric <br />service since more specific estimates would depend upon the actual <br />design plans. A second report was subsequently prepared in early <br />June addressing projected costs of drainage work that would be <br />required in con~unction with this project. <br /> <br />In response to various questions he further explained that the <br />figure for the heat allowance was estimated before receipt of the <br />hydraulic engineer's report but he stated :hat the cost of~e work <br />detailed in that report would probably be fairly close to the previous <br />allowance. He also stated that some fill would be needed to sub- <br />grade~e property; and that there did appear to be some difficulty <br />with the placement of~e present retaining wa~l, in about three <br />locations. <br /> <br />Trustee Mazochi said that it was his impression that the fire company <br />had offered to put up the building if the village would provide the <br />material but that seems ~ have changed. <br /> <br />MEe Delehanty stated that with the increased scope of the work, the <br />fire company did not have the technical capacity to do the work <br />themselves since there were no longer any masons nor electricians in <br />the company~ and they anticipated having t o subcontract the work. <br /> <br />Mayor Synnett stated that there was not suf[icient funds available <br />at ~is time to undertake a project o~ this size; that the money <br />previously designated from the CDBO funds was no longer available, <br />and would bare to be used towards the water line repairs at the <br />Bleachery~ <br /> <br />Treasvrer Campilii explained that approximately 16~ of the village <br />budget was already Committed to bond projects for the acqu£sit~&n~ <br />of the firehouse properties, the purchase of the loader, and other <br />projectsI and since bond anticipation notes would have to be paid <br />off in five years, this would create to heavy a burden on the <br />taxpayers at this time, Me also explained that to float a bond on <br />this pr®ject, the villag· would have t o put 10% dow~ or approximately <br />$13,700. <br /> <br /> <br />