My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1966-02-09
VillageOfWappingersFalls
>
Village of Wappingers Falls
>
Village Board Minutes
>
1960-1969
>
1966
>
1966-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 9:33:00 AM
Creation date
4/12/2007 6:29:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
223 <br /> <br />The regular ~eeting of the Village Board of Trustees was held on Feb. <br />9, 1966 at 7.30 P.M. in the Mesier Homestead. <br />Those present: Mayor Furnari, Tr. DIDomizio, Tr. Temple, Tr. Bain, Tr. <br />Napoleon, Tr. Cheetham and Att. MacDonald. Tr. VanVoorhis absen~ due to <br />illness. <br /> <br />Minutes of last regular Village Board meeting held on Jan, 12, 1966 were <br />read by Clerk. <br />Letter of thanks for Christmas decorations should include Lions Club <br />along with Jnulor Chamber of commerce. <br /> <br />Motion by Tr. DiDOmizio, seconded by Tr. Bain, that minutes of last <br />regular Village Board meeting be accepted as corrected. Carried. <br /> <br />Communications: <br /> <br />Letter was read from Imperial Theatres, Inc., requesting change in Fire <br />Prevention Code..TO be taken up later in the meeting. <br /> <br />Letter was read from MiltOn ChaZen, Engineer, concerning Wappingers <br />Lake Dam Estimate which reads as follows: <br /> <br />Method #1 Construct new spillway section on downstream face of Dam. <br />Repair existing gates and replace east retaining wall. <br /> <br /> Estimated Cost $125,000.OO <br /> <br />Method $2 Repair existing masonry structure by applying 2" of Gunite <br />to downstream face of spillway section, repair gates and reinforce re- <br />taining wall at point of failure. <br /> Estimated Cost $2~9000.00 <br /> <br /> In addition an extensiVe system of venting should be designed to el- <br /> iminate vibrations cuased by the vacuum created during periods of high <br /> fl~. <br /> <br /> Estimated Cost $10,0OO.00 <br /> Copy of Estimate to be turned over to Lake Co~m. and Att. MacDonald. <br />· Letter was read from capt. costa Concerning investigation ~f fires. <br />MaYor Furnari to confer with Capt'. Costa and Fire Chief Cinelli concern- <br />ing this. <br /> <br /> Letter was read from Mrs. Paul Pulichene, 18 McCafferty Pl., concern- <br /> lng sidewalk complaint. <br /> Copy of letter tO be turned over to Mr. Berinato and TrUstees Temple <br /> DiDom~zio of Highway Committee. <br /> <br /> T~ you Notewas read from'Francis Prince, pirie'Hill Dr., thanEing <br /> Board for installation of Traffic Light on Rt. 9. Ordered filed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.