Laserfiche WebLink
The regular meeting of the Board of Trustees was held at the Mesier <br />Homestead on Tuesday Jan. 5, 1960 at 7:3Q P.M. <br /> <br /> Those present at roll call were, Mayor McCloskey Trustee's GalluCci, <br /> Silvwstri, Berinato, Canale, Sanfllippo, also Treas. Mcgonald, <br />Atty. Schofield and Prof. Pearse. <br /> <br /> Meeting was called to order and the minutes of the regular meeting <br />was read Upon motion by Trustee Gallucci, seconded by Trustee Sllvestri <br />the minutes were accepted as read. Carried. <br /> <br /> The Mayor told the board of the hearing on the ordance for the <br /> six stop signs in the Village. There were 20 people present, <br /> after some discussion, is was agreed that the s%gn stay where <br /> they were placed for a period of one year. <br />A Claim was received from Mr. Feilding Brown of the Village, The <br /> clerk was t~ld to give same tb our insurance carrier to process. <br /> Mr. Ackerman, Eng. on the Sewer Ext. project, was asked to get <br /> in touch with the Mid. County Const. Co.. in reference to the <br /> condition of the street , on Mesier Ave. Ext. <br /> Mr~ Ackerman, of the Schuerman &~ Ackerman Eng., Eng. on the <br /> Sewage Treatment plant and the Sewer Ext. System. gave the <br /> following reports. <br /> 1. The contract for the construction of the sewage treatment <br /> plant by ~obert Young Const. ~o., Inc. is practically complete. <br /> the remaining work consists of a minor adjustment to the equipment <br /> inthe new settling tank, replacement of a faulty electrial lead, <br /> setting thermostats in final locations and lowering a small water <br /> pipe. The grit chamber and settling tank have been in service for <br /> several days; the chlorination apparatus was operated for a few <br /> hours to check the installation. We feel that the chlorinator <br /> will be in operation only during summer droughts when the flow in <br /> Wappingers Creek is less than 25 or 30 ~ubic feet per second. <br /> not <br /> We have received a requisition from the Contractor since Nov- <br /> ember 1st. at which time, the value of the work done was $13B,082.25. <br /> Of that amount~ 15% is retained until final acceptance and payments <br /> therefore have been made in the amount of $113,119.91. Since Nov- <br /> ember let, the value of work done has increased to approximately <br /> $135,575., which amount is substantially 100% of the total expected <br /> cost. The final total will exceed the base bid for which the con- <br /> tract was awarded by about $ $,900. The extra costs represent an <br /> over-run in the estimated rock excavation, cost of additional fill <br /> matieral required by a necessary change in location of the contact <br /> tank,additional grading and fencing to provide more security against <br /> vandalism. <br /> <br />2. The construction contract for addition to the sewer system by Mid <br />County Construction Co. is nearing completion. Re-paving work ex- <br />cept for a small amount done before the onset of cold weather, is <br />to be deferred until spring and there are two short lateral connec- <br />tions remaining to be installed in givens Avenue. <br />The Contractor's statement for December work has not been received <br />to date. Prior to December $, 1959, the value of the work done <br />amounted to $56,265.60 and payments for 85% of this amount have bee~ <br />made. The value of the work done during December is expected to be <br />approximately $8~500.~ and the balance of the pavement restoration <br />will be approximately $2,300. ~he total contract cost probably will <br />be about $ 3000., less than the base bid proposal. MOst of this <br />difference is accounted for in the total actual rock excavation- <br />about 920 cubic yards actual, versus 1220 cubic yards the estimated <br /> <br /> <br />