Laserfiche WebLink
MINUTES OF SPECIAL MEETING FOR BERKELEY SOUARE 5/21/98 <br /> <br />Present: Tom Visentin, Tom Morris, Rob Alfonso, George Moran and Mary Ann <br />Bolander. <br /> <br />Absent: John Karage <br /> <br />Others Present: <br /> Bob Travis <br /> Howard Loewentheill <br /> Bill Bricklemaier <br /> <br />Armand Alfonso <br />Chuck May <br /> <br />Meeting was called to order at 7:47p. m. Mr. Visentin stated the purpose of this meeting <br />was to grant final approval to the Berkley Square project. He felt there were still three <br />outstanding issues: (l) water pressure problem must be resolved, (2) sanitary sewer <br />problem and (3) storm water problems on the site itself. <br /> <br /> Mr. Bricklelmaier stated that Insite Engineering has several other issues that must be <br /> resolved and addressed Mr. Visentin talked about the meeting hem earlier in the week <br /> regarding the concerns about the two simultaneous fires taking place at one time with the <br /> insurance companies. Applicant stated he would be installing an on-site system which <br /> would provide adequate water pressure and not impact adjacent sites. It was st/oted that <br /> Mr. Paggi wouM be checla'ng to see if there wouM be enough hydrant flow. V' <br /> Applicant has agreed to contribute $25,000.00 towards expediting the solution to the~' <br /> sewer problem. As far as outstanding engineering issues - the main one being storm <br /> water run-off- applicant will get with Mr. BricMemaier to resolve the concerns listed in <br /> his November 5, 1997 letter and Mr. Bricklemaier stated he will need an updated set of <br /> prints to reflect any changes that have been made. <br /> <br /> Mr. Bricldemaier went over his letter dated November 5, 1997 and stated that applicantJ <br /> would have to finalize the exact number of parking spaces available to Ashley Gardens <br /> residents. Several formal easements will be required for the subject proposal and Mr. <br /> Viglotti stated he did not see how this could not be worked out. It was stated that <br /> applicant would have to check with Village Attorney regarding the title report associated <br /> witJj4he submitted survey. It was stated that the applicant get a letter from Fire Chief <br /> r~arding the emergency access between the subject project and Ashley Gardens. The <br />~qight intensity is to be resolved There are still stormwater issues that must be worked out~ <br /> between Insite Engineering and the applicants professional and it was suggested a <br /> meeting be set up to discuss these comments. <br /> <br />Mr. Morris made a motion to grant final site plan approval, seconded by Mr. Alfonso <br />contingent upon the wording of the final resolution being done by Village Attorney <br />Viglotti. This resolution is to include the following: (7) A water pressure problem has <br /> <br /> <br />