My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-08-17
VillageOfWappingersFalls
>
Village of Wappingers Falls
>
Village Board Minutes
>
1990-99
>
1993
>
1993-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2007 12:27:20 PM
Creation date
1/30/2007 9:47:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tuesday, August 17, 1993 <br /> <br />An ~mergency Workshop regard/rig the Hc~e Depot project being constrtlcted in the <br />i~ial Plaza and to coordinate our efforts ~n conjunction with sane. <br /> <br />Present: Trustees DiDomizio, Napoleon, Shay Bain and Usavich, Atty. Viglotti, Engi~crs <br />Paggi & Cc~telmo, Planning Board Cb~irman Visentin and member, Thomas Alfonso, Water <br />Co~nissioners Mazochi and Capanno, Zoning Enforcement Officer Pacio, Bldg. Inspector <br />Alfonso, .Fire Inspector Sanfilippo. <br /> <br />The following was discussed in conjunction with the project: <br /> <br />There was a misunderstanding as to who was appointed Clerk of the Works and it was in <br />the interest of the Village that we come to an agreenent and appoint an individual who <br />will coordinate project. <br /> <br />Tb~re was controversy regarding escrow accounts. <br /> <br />It was determined that Construction agr~--~_nt regarding water mains and improv~rents <br />was ratified. <br /> <br />It was determined that Water Department has to be made aware of when they are laying <br />pipe and pressure testing and Engineer should be designated to inspect all phases of <br />pipe im~tallation & testing. <br /> <br />Atty. Viglotti reported we should engage an Engineer as Planning & zoning dont feel <br />they should be orchestrating entire project. <br /> <br />Unauthorized officials signing Escrow vouchers also was discussed. <br /> <br />Mr. Visent~n said a problem may have b~-n created when we hired one engineer for <br />Water and one for other Village matters and he didn't agree with having 2 engineers <br />making inspections and one project coordinator. <br /> <br />It was determined scmeone has to keep Board apprised as to what was going c~. <br /> poured <br />It Was determined water pipes were being laid and footings/without supervision <br />and we want to determine whose job it is to supervsle project. <br /> <br />In the interim, Eng. Paggi will handle all on site/off site water inspections <br />and other work such as sewer/footings will fall under the jursdiction of Insite. <br /> <br />There w-as a point made that no one was ever directed to oversee project and both <br />Er~ineers advised they had sent letters pertainln' g to s~ne. <br /> <br />There was question as to after Site plan approval by Planning, whose administrative <br />resl0onsibility was it regarding construction and it was determined this fell under <br />the jurisdiction of the Building Inspector. <br /> <br />It also was asked whose responsibility was it to. authorize site inspections by the <br />Engineers. <br /> <br />bg~0o frc~ Eng. Paggi advising b~ ccfL,~enced an c~ site inspection on 8-13-93 and <br />Will continue on a as needed basis regarcling water syst~n <br /> <br />It was suggested we initiate a policy of updating the Escrow accounts frc~ ~_~me to <br />time, to cover periodic inspections. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.