Laserfiche WebLink
MINUTES OF PLANNING BOARD MEETING HELD 10/5/00 <br /> <br />Present: John Karge, Joe Consentino, Rob Alfonso and Mary Ann Bolander, Secretary <br /> <br />Absent: Tom Morris <br /> <br />Others Present: <br /> Fong Ri Song <br /> T. M. Serino <br /> <br /> Joseph Lo Monaco <br /> Eileen Sassmann <br /> Nancy Bostwick <br /> Alice Rogers <br /> Tony Sidote <br /> Lawrence Wisdo <br /> Eugene Ninnie <br /> Newell Russell <br /> Rafael Filibert <br /> Jennifer Van Tuyl, Esq. <br /> William Bricklemaier <br /> Robert Kortright <br /> Robert McDonough <br /> <br />D. P. Serino <br />Andrew Grundy <br />Judy Morris <br />Margaret StrobIe <br />William Bostwick <br />Jack Rogers <br />William Mitchell <br />Cynthia Wisdo <br />Linda Simmer <br />Joe Poillucci <br />Chris Serino <br />Richard Cantor, Esq. <br />Steve Tinlemean <br />Robert Juliano <br /> <br />Meeting was called to order at 7:30p. m. It was noted in Mr. Morris' absence that Mr. Karge <br />wouM act as Chair for this evening's meeting. <br /> <br />SUSHI TAKE OUT RESTAURANT. DUI'CHESS SHOPPING PLAZA <br />First on the agenda was the informal appearance of Mr. Ri Song with a proposal to have a Sushi <br />take out restaurant in the Dutchess Shopping Plaza. Mr. Song stated he would be having strictly <br />take out. There would be no buffet style serving. Mr. Song presented a preliminary sketch. He <br />stated there may be approximately 10 seats. Mr. Alfonso stated that applicant should have <br />brought in a drawing of what exactly he wanted to do in the space. Mr. Karge informed <br />applicant that he would have to come back to the Planning Board with a drawing showing the <br />layout of the space. <br /> <br />CIVIL TECHNOLOGYt 8 SOUTH A VENUE <br />Next on the agena~t was the appearance of Eugene Ninnie with an amended site plan for his <br />parcel at the above address. Mr. Karge stated that there were some people who <br />were taken by surprise that he had taken down the entire building as this was not part of the <br />original site plan. Applicant stated he ran into some structural problems. One was when he <br />uncovered the inside of the building the block had ~ inch joints going down to nothing. There <br />was no way he could certify this to the bank There was no way that the block could hold a <br />second story. Also he needed to keep on working with his present contractor who would be able <br />to demolish the building at this time. Mr. Alfonso asked if there were any other changes and <br />applicant stated when he had to backfill the building and he had to raise it up by one corsing <br /> <br /> <br />